Integrated engineering systems for the CIDO universal sports arena

  • Client Panevėžys arena
  • Implementation period 2008
  • Project location Panevėžys, Lithuania
  • Project partners TimeTronics and Stramatel
  • Project task The installation of modern engineering systems that assist in the organisation of high-level sport competitions and events in the CIDO arena.
More information

Solutions in this project

  • Local TV studio
  • Sports event information management and display software
  • Cycling timing system
  • Video cube
  • LED displays
  • Security alarm system
  • Access control system
  • Video surveillance system
  • Power supply
  • Clock systems

FIMA specialists installed a photo finish system and a sport competition information system, put in place a local TV system and implemented a high-resolution video cube.

FIMA specialists implemented local TV system including TV cable network and triax cable network, access control system integrated with a security alarm system, a video surveillance system comprising 70 CCTV cameras and a sports competition information system complying with FIBA requirements in the CIDO arena. FIMA engineers put in place a high-resolution video cube weighingeight tonnes, which can be raised up during events byprogammable hoists.

FIMA also installed cycling timing system – the first photo finish system in Lithuania.The system can accurately identify the race winnerwhile the software captures all the action from a competition and transmits it to the video cube.

Related projects