The project included the upgrading of traffic control, power supply and telecommunications systems on a 110 km section of railway.
As part of this very large and complex project, FIMA and its partners designed and upgraded the signalling, telecommunications and power supply systems at Kaunas station, on the Palemonas–Rokai–Jiesia detour and on the line between Kaunas and Kybartai.
The entire railway line connecting Kaunas, Kybartai and the Lithuanian state border with the Kaliningrad Region of the Russian Federation has been modernised with an up-to-date computerised rail traffic control system which enables the Vilnius Traffic Control centre to control the signalling and power supply equipment at all stations and level-crossings on the line and to control traffic on the line.
While installing the railway traffic control system, specialists from Fima and its partners carried out a number of specific tasks:
The completed project is unique in terms of its scale and complexity as well as the integrity of engineering operations implemented. The work was carried out by more than 200 professionals who were all experts in their particular fields. The project was implemented without stopping regular rail traffic on this intensive transport corridor.
The project has allowed the line speed to be increased to 160 km/h.
Project facts: