Integrated project to install engineering systems in the Stasylos railway border inspection post

  • Client Lithuanian railways
  • Implementation period 2007 to 2011
  • Project location Lithuania
  • Project partners Bombardier Transportation
  • Project task Installation of traffic control, communication and security systems in a new border inspection post in Stasylos to strengthen external EU border security.
More information

Solutions in this project

  • Railway traffic control system
  • Communication systems
  • Video surveillance system
  • Access control system
  • Public address system

FIMA set up microprocessor-based traffic control and a level crossing system, modernised and developed communications systems in a new passenger transport inspection post and implementedsecurity solutions in Stasylos station.

In order to strengthen the EU’s external borderand ensure compliance with the Schengen Agreement, a new railway inspection post was opened in Stasylos on the Lithuanian-Belarus border.]

FIMA set up a microprocessor-based traffic control and level crossing signalling system, modernised and expanded communications systems and implemented security solutions.

To control traffic, FIMA specialists installed a microprocessor-based signalling systemmanufactured by Bombardier Transportationon five points and three level crossings. Theylaid34km of fibre optic cable from Stasylos station to Valčiūnai station, modernised all of the technological communications equipment at stations on the route up to Vilnius traffic control centre and installed CCTV on the platform and inside Stasylos station as well as implementing security, access control and public address systems.

Related projects

Testimonials

  • You can entrust the installation of complex engineering systems to FIMA experts.

    Michail Lipkin, Director of UAB Vitras-S.